Building your home · Part 5 of 7

Interiors

The finishes you live with every day: walls and ceilings, trim and doors, floors, tile, and the kitchen. Some are choices of look, some are allowances you shop within, and all of them go over a house built tight underneath.

Finished great room with a wood ceiling, big windows and a kitchen island

Three kinds of decisions

Inside the house, nothing is Good, Better, Best. Each page tells you up front which kind of choice it is.

Compare optionsDifferent, not better. Each compared on look, upkeep, lifespan, and cost.
AllowanceYou pick products within a budget set in your estimate.
How we buildNot a choice: the way every Bedrock home is finished.

FAQ

Common questions

What is an allowance?

A budget set aside in your estimate for things you pick yourself, like tile, cabinets, countertops, and appliances. Choose something that costs less and the difference is credited back; choose more and it's added by change order.

Which interior work does Bedrock do itself?

Our crew does the finish carpentry, wood ceilings and paneling, stairs, tile, cabinet installation, and engineered wood floors. Drywall, paint, other flooring, and countertops go to local specialists we schedule and oversee.

When do I need to pick my finishes?

Early. Tile, cabinets, and countertops have lead times, and some choices change what we build before drywall, like blocking for cabinets or a curbless shower. Your schedule lists a date for each selection.

Not sure where to start?

We'll walk through every finish with you during pre-construction, using your plans, budget, and the way you live.